The total length of the Ningbo-Taizhou-Wenzhou shield and pipe jacking project tunnel is 461.5m and the inner diameter is 3m.After the tunnel has been built up, a natural gas pipeline with a diameter of 813 mm and a product oil pipeline with a diameter of 406.4 mm will be laid, thus the history of no direct natural gas supply in Zhejiang coastal areas has been ended, and the complementary gas supply of annular pipe network in Yangtze River Delta is realized.
Iraq Natural Gas Processing Plant Project
Iraq Graf Project
Iraq Halfaya Oilfield Well Site Power Supply Project
Oil depot project in Nasiriyah, Iraq
Steelmaking and Continuous Casting Project In Iran
Iraq Early Power Station Trial Operation and Operation Support Project
Commissioning and Operation Support of Iran’s North Azadegan
东非原油管道项目
Beijing Gas Tianjin Nangang LNG Emergency Reserve Project Export Pipeline Project
Hebei Xintian Tangshan LNG Receiving Station Export Pipeline Project